Skip to main content

Posts

Showing posts from June, 2012

Penggunaan SCADA System di Oil & Gas

Ada beberapa peralatan/istilah yang lazim digunakan dalam Control System, yaitu: SCADA (Supervisory, Control, and Data Acquisition) HMI/MMI (Human/Man Machine Interface) PLC (Programmable Logic Controller) DCS (Distributed Control System Remote I/O (Input/Output) Signal Conditioning Data Transferred Media (Coaxial Cable, Optic Cable, Radio Freq) Processor, Memory(RAM/ROM) ..dst  Tanya - Frenky Norman Frenky_norman Dear rekans yang terhormat,   Saya  masih awam tentang SCADA system yang digunakan di Oil & Gas.Apakah  ada diantara diantara rekan2 yang dapat memberikan penjelasan tentang  sistem ini dan cara kerjanya? Kemudian bagaimana keterkaitannya dengan  Nodal Analysis dan Production Networking?   Kira2 dimana saya bisa mendapatkan referensi tentang sistem ini?     Sekiranya ada rekans yang bisa membantu saya ucapkan terima kasih.   Tanggapan 1 - Ariyo Bowo male_moeslim Pak Frenky      Sedikit komentar dari saya...

Step Up Tegangan 3 Phase

"Secara umum untuk menaik-turunkan tegangan 3 phasa, kita bisa menggunakan 1 buah trafo 3 phasa atau 3 buah trafo 1 phasa. Ada beberapa manufaktur lokal yang sering suppply transformer distribusi ke PLN maupun ke industri2 dalam negeri." Tanya - Nandha H (MJEE) nandha@mjee Dear kawan2 KMI Saya mau tanya, jika ada supply tegangan 3 phase 220V 60Hz ingin dinaikkan menjadi 3 phase 380 V 60 Hz, bagaimanakah caranya. Apa menggunakan trafo untuk tiap phasenya saja bisa (berarti tiap phasenya 110 V dinaikkan menjadi 220 V, atau 2x), atau adakah jenis trafo yang khusus digunakan untuk tegangan 3 phase, sehingga tidak mempengaruhi frekuensi dan phasenya. Kalau ada kira-kira product apa yang bisa digunakan (merek tertentu)? Mohon pencerahannya. Terimakasih banyak Tanggapan 1 - a_firmansyah95 agung Nandha, Trafo tdk mempengaruhi frekuensi. Output frek sama dng input frek. Ada bbrp pilihan trafo yg bisa dipakai dng rasio 380V/220V  (Primer/Sekunder): 1. Pakai 1 buah trafo 3 fasa 2...

Menembus Kerja Praktek (KP) di Perusahaan MIGAS

MENEMBUS KERJA PRAKTEK DI PERUSAHAAN MIGAS oleh: J. Anton Witono (Chairman Komunitas Migas Indonesia Cabang Kaltim) Saya beberapa kali membantu adik-adik untuk mendapatkan kesempatan untuk kerja praktek di tempat saya bekerja (sebuah perusahaan MIGAS Perancis berlokasi di Kalimantan Timur). Tulisan ini dibuat berdasarkan pengalaman dan opini pribadi. Latar belakang saya adalah Teknik Kimia dan saya bukan orang HR. A. MEMILIH TOPIK & DURASI KP 1. Buka jendela wawasan dan informasi. 2. Cari topik yang sesuai dengan peminatan atau latar belakang jurusan kuliah anda. 3. Browsing internet, ikuti hot topic di media massa/ TV, konsultasi dengan senior yang sudah pernah KP sebelumnya dan tanyakan kontak mentornya, diskusi dengan dosen, hubungi alumni yang bekerja di perusahaan yang bersangkutan. TIPS : cari informasi tanpa kacamata kuda. Seorang mahasiswa Teknik Kimia tidak berarti KP-nya melulu harus di departemen Process Engineering. 4. Tetap fleksibel....

Job Invitation

Our company is engaged in the Engineering & Project Management for oil & gas , open to Job . positions / disciplines: 1. Mechanical/ Pipeline Engineer ( Fresh Graduate ) 2. Mechanical/ Piping Engineer (Fresh Graduate ) 3. Electrical Engineer ( Fresh Graduate ) 4. Instrument Engineer ( Fresh Graduate ) 5. Civil Engineer ( Fresh Graduate ) 6. Telecom. Engineer ( Fresh Graduate ) 7. Process Engineer ( Fresh Graduate ) 8. Geodesi Engineer ( Fresh Graduate ) For those interested, can directly send Curriculum Vitae to azarsetiawan@gmail.com

Need Urgently for Turret & Mooring Supervisor and IT System SAP Spec

We are a well established contractor company in Indonesia. Our client currently is looking for : 1. Turret & Mooring Supervisor (TMS) 2. IT System SAP Specialist (National) (IT SAP) You can find the specific requirements in the attachment I enclosed. If you are interested, please send your CV on format MS Word with the softcopy of related certificates to e_recruit_oilgas@yahoo.com including your expected salary per month.  P lease WRITE  : "CODE : DSK" in your subject email We are looking forward to your applications. Best Regards, Sonia Senior Recruitment Manager

URGENTLY REQUIRED

VME Process is a leading supplier of process systems to the oil and gas industry. We are currently looking for a qualified candidate for the position.   LEAD HSE OFFICER   Basic Requirement:   1.       Minimal Diploma Holder 2.       5 years’ experience in similar position. 3.        Understanding OHSAS system and implementation, and environment care. 4.    Having managerial skill amd leadership 5.    Having  AK3 Certificate   Main Responsibility:   1.       Assist staff monitor departmental compliance to local, policies and procedures with accredation standard. 2.   Develops and maintain environment for continually quality improvement. 3.   Develops and utilize electronic methods data collection. Gat hers, process and analyze date to create reports, charts, ...

Air Energi - Senior Automation Engineers / Technologists (Instrumentation)

We are currently seeking Senior Automation Engineers / Technologists (Instrumentation) to work for a major EPCM based in Alberta , Canada . A job overview is attached for your information. This is initially a contract position leading to a permanent opportunity.   Candidates require – A minimum of 8 years past experience in Instrumentation within an EPC     A complete understanding of the engineering documents associated with instrumentations such as: P&ID's, loop sheets, specification sheets, wiring diagrams, logic diagrams, installation detail drawings, etc   A 2 year diploma in Instrumentation Engineering Technology or Engineering Degree is required OR the equivalent combination of education and experience will be considered     If you are interested in this position or keen to receive a recruitment plan obtaining the other positions Air Energi Canada is dealing with the please reply to this email with an up to date ...

Lowongan Piping Engineer dan Estimator

PT. Mitrindo Dutaprakarsa are engineering and manufacturing company, with experiences in Pulp & Paper, Oil & Gas, Steel Mill, Fertilizer, etc. since 1997. We are currently looking for a qualified candidate for the position below for our workshop at Karawang, Jawa Barat : Piping Engineer and Estimator Requirements: 1. Male/Female, Age: maximum 35 years old (All Position) 2. STM or Diploma Degree in Engineering background 3. Minimum 2 years experience in same position (experience in FABRICATION manufacturing is an advantage). 4. Good Communication in English 5. Familiar with AutoCAD 2007 or earliest version and MS Office programs 6. Willing to work at Karawang – Jawa Barat Please send a comprehensive resume or Curriculum Vitae. Explain why you are interested in the above position, what values, skills & competencies you bring for us including your contact telephone number, and recent photograph to : hrd@mitrindo.com

Deadlegs

"Ada beberapa definisi Deadleg yang disampaikan oleh para ahli korosi, diantaranya adalah "   1. "Any section of pipework or a vessel where the rate of flow is very low or zero"   2. "Section of pipe work or vessel which contain liquid under stagnant condition or where there is no measurable flow"   3. "Any unused length of pipe longer than six diameters of the unused pipe measured from the axis of the pipe in use"   4. "A pipe branch that under normal operating conditions does not experience operational flow"." Tanya - Robby Wahyudi Dear rekan milis,      Mohon pencerahannya tentang deadlegs pada piping   Sebenarnya apa fungsi dari deadlegs itu ?   Ada hubungannya dengan pressurized dummy support leg ?      Terima Kasih sebelumnya Tanggapan 1 - ifan rifandi Pak Robby,      Ada beberapa definisi Deadleg yang disampaikan oleh para ahli korosi, diantaranya adalah "   1. "Any section of pipework or a vesse...

Ground Vibration Akibat Aktivitas Pilling

"Vibrasi pada pilling adalah getaran transient yang intermiten, tentu hal ini berbeda dengan getaran kontinu. Namun pilling terutama dengan impact driver akan menghasilkan getaran impuls secara berulang. Seperti kita ketahui, getaran yang dihasilkan oleh impuls akan mampu menghasilkan getaran dengan kandungan frequency yang cukup lebar tergantung dari kekerasan dan kekakuan material. Untuk impact drive pilling biasanya menghasilkan kandungan frequecy hingga 100 hz, tentu hal ini berpotensi mengeksitasi frekuensi pribadi dari bangunan. Bangunan biasanya lebih sensitive oleh getaran pada frekeunsi cukup rendah < 40hz. Oleh karena itu perlu dicermati jarak terdekat dari dari pilling area ke bangunan di sekitarnya. Untuk hal ini USBM memberikan panduan berapa getaran maksimum, dinyatakan dengan peak particle velocity, yang diijinkan diterima oleh suatu bangunan. Tentu bangunan baru dan bangunan tua memiliki kriteria yang berbeda." Tanya - Wilis Wirawan ww@sarana-ahli Reka...

Dry Transf. vs Oil Transformer

"Kelebihan dry type transformer (DTT) dibanding Oil cooled Transformer (OCT) : §    DTT memiliki Low maintenance cost karena pembersihan debu secara rutin. OCT membutuhkan pengecekan oli secara rutin, purifikasi dan penggantian oli yang membutuhkan biaya sangat tinggi. §    DTT Bisa diinstall sedekat mungkin dengan beban (Panel distribusi, MCC, dll, sehingga akan mengurangi losses dari transmisi (memungkinkan menggunakan bus-duct dari trafo ke beban). OCT tidak memungkinkan. §     DTT Membutuhkan space lebih sedikit untuk installasi dan bisa diintegrasikan dengan incoming VCB cubicle dan panel distribusi. OCT tidak memungkinkan, harus menggunakan kabel. §     DTT memiliki potensi kebakaran di substation lebih rendah karena tidak menggunakan oil dibanding OCT. §    Untuk beban-beban high rise Commercial building, DTT dapat ditempatkan di dalam building, sedangkan OCT harus ditempatkan jauh atau diluar ...