Select Page
To give you a brief overview of the project, the Liam Flow Station is a production complex situated approx. 150 km offshore Java (operated by PT. PHE ONWJ) which has been experiencing subsidence resulting in a significant reduction of the safe air gap clearance of the platforms relative to sea level. The current subsidence study has indicated that the Lim Flow Station will not be reliable for safe operation and consequently a permeant long term solution is planned by raising the most critical platforms and facilities to ensure continued and safe operation for the Lima Flow Station to the end of the ONWJ PSC in 2026 and beyond.
 
There will be a fully cycle of activities (EPCI) to remedy the subsidence problem by the use and implementation of a simultaneous deck raising system to raise the Lima Compression, lima Service and Lima Platforms as well as the associated bridges and flare by 4 meters.
 
We would be looking at an 18 month (minimum) duration, the package can be negotiable and the role is based in Jakarta. The client has said they are looking to secure the role ASAP so within reason availability could be a key factor.
If you feel that this position would be of interest to you please get back to me and I will ask one of our senior recruiters to contact you for a detailed discussion.
Those who are interested please send CV to Judy Campbell <judy@bljsolutions.com>
Share This